Free service hotline
Tel:188-2379-9985
Email:info@jtl-lab.org
Address:Area 2-1102D, Building T2, Haigu Science and Technology Building, Shiyan Street, Bao'an District, Shenzhen
Current category:European Union
Back to list1. Introduction to CertificationEMC (Electro Magnetic Compatibility) refers to the ability of a device or system to operate in compliance with the requirements in its electromagnetic environment witho
Add WeChat
1. Introduction to Certification
EMC (Electro Magnetic Compatibility) refers to the ability of a device or system to operate in compliance with the requirements in its electromagnetic environment without causing unbearable electromagnetic interference to any equipment in its environment. Therefore, EMC includes two requirements: on the one hand, it means that the electromagnetic interference generated by the equipment during normal operation cannot exceed a certain limit; on the other hand, it means that the equipment has a certain Degree of immunity, that is, electromagnetic susceptibility. EMC certification is a directive on electromagnetic compatibility in CE certification.
2. Certification mark
3. Certification Standards
product | Electromagnetic Compatibility Standards |
Information technology ITE/audio and video power supplies/products |
EN 55032 |
Lighting products |
EN 55015 |
Home Appliances |
EN 55014-1 |
Industrial, scientific, medical products |
EN 55011, |
battery products |
EN 61000-6-1 |
4. Test items
radiation(RE)10m | radiation(RE)3m |
Radiated Immunity(RS) | radiation spurious(RSE) |
Conduction(CE) | Conducted Immunity(CS) |
Harassment power(DP) | three loop antenna(3Loop) |
lightning strike(SURGE) | static electricity(ESD) |
Electrical Fast Transient Bursts(EFT) | Voltage Dips & Short Interruptions(DIP) |
Harmonic flicker (H&F) three-phase | Power frequency magnetic field (MS) |
Click(Click) |
|
5. Certification process
1. Application ((1) fill in the application form; (2) provide information and send samples);
2. Quotation (according to the information you provide, there will be engineers to draw up the corresponding standards, test time and corresponding costs);
3. Payment (after the applicant confirms the quotation, sign the filing application form and service agreement and make payment);
4. Testing (the laboratory conducts a full set of tests on the applied product according to the relevant EU testing standards);
5. The test is passed and the report is completed;
6. After the project is completed, a CE certificate will be issued.
6. Certificate cycle and validity period
Cycle: about 2 weeks. In special cases such as: abnormal test, incomplete samples, etc., it is necessary to increase the corresponding time according to the actual situation.
Validity period: depends on whether the standard has expired, if the standard expires, the certificate will also expire accordingly, and re-certification is required
7. Factory inspection
No factory inspection required
European Union |
·Test content: Electromagnetic Compatibility ·Applicable products: all electrical and electronic equipment within the EMC Directive ·Whether mandatory: Yes ·Factory Inspection: None ·Local agent: Yes ·Plug type: European standard ·Voltage requirement: AC 230V, 50Hz ·Application method: direct application ·Certificate holder: ·Certificate validity period: Standard replacement needs to apply again ·Official website: ·Certificate query website: ·Other supplements: |